Surigao Water Supply Project

River Water to Drinking Water
4,000 cubic meters per day

The Surigao Water Supply Project targets serving the city customers—local government units, water districts and other water distributors. In order to meet the increasing needs for safe drinking water, WaterMatic was selected to design, build and supply the water treatment facility.

After being selected, WaterMatic designed, manufactured and supplied a complete water treatment system to provide clean and safe drinking water with a capacity of 4,000 cubic meters per day. The advanced hydraulic design allows for energy savings, meeting all of the client’s engineering standards.

The treatment process implemented in the system to achieve the required drinking water quality includes: pre-chlorination; coagulation and flocculation; clarification by tube settler clarifier; media filtration and post chlorination.